It is important to maintain accurate BOMA stock assembly and process costing system, which provides facilities to specify the structure of finished items in terms of sub-assemblies and components. records. Details such as markup and valid from or to dates can change over time.
You can amend active versions of the BOM without incrementing the version number, if version control is in use and either of the following is true:
Some of the information that you can enter and use in the Bill of Materials module cannot be used in the Estimating, Planning and Works Orders modules.
Phase |
How many Resource Types? |
Resource Type |
Primary/Secondary |
Fixed Length |
---|---|---|---|---|
Setup |
Two |
Select no more than two resources for this phase. One must be a Machine Resource or a Machine Resource Group. The other can be a Labour Resource or Labour Resource Group. Note: Adding a Labour Resource or Labour Resource Group updates the Include in Labour Requirements check box on the works order operation when a works order is created from the BOM record. |
Select Primary or Secondary for one or the other resource. |
You must select Fixed Length for the resource. |
Runtime |
Three |
Select one Labour Resource or Labour Resource Group. Select one Machine Resource or Machine Resource Group. Select one Tool Resource or Tool Resource Group. Note: Only select a tool resource or resource group if you have also selected a labour and a machine resource or resource group. |
Select Primary for your labour Resource Type and Secondary for your machine Resource Type or vice versa. Note: Do not select either Primary or Secondary for your tool Resource Type selection. |
Do not select Fixed Length for the resource or resource group. |
Teardown |
None |
|
|
Open: Bill of Materials > Records > Amend Bill of Materials.
Open: Bill of Materials > Records > Amend Bill of Materials (Elevated Privileges).
You can amend:
You cannot amend:
However, you can create new BOM versions in these circumstances.
Click Create New Version from the BOM version drop-down list.
The Record Selection window appears.
The BOM version number is incremented to the next available version number, based on the Version Number Increment value in the BOM Settings General tab.
Make the changes you require to the BOM.
Important! If the BOM has been created by converting a one-off works order, an operation is listed in the BOM as a result of conversion. Do not rename this operation. If you do, you will not be able to update information between the Bill of Materials and the Works Order.
Note: The Bill of Material Details tabs function in the same way as when creating the BOM.
Confirm that you want to continue to amend it.
If you are using version control, a new version will be created. If you are not using version control, you can continue to amend the BOM.
Note: You can change the BOM on hold status by selecting the BOM and selecting Change Status in the toolbar. Alternatively, use the Change Status option in the BOM Records menu.
To save your changes, click Save.
Note: If you are using all Manufacturing modules, have selected Perform Compatibility Checks in System Settings Environment tab and have compatibility issues, the Compatibility Warnings prompt appears.
Note: If you are using all Manufacturing modules, have selected Perform Compatibility Checks in System Settings Environment tab and have compatibility issues, the Compatibility Warnings prompt appears.
If you have used the Amend (Elevated Privileges) option to make changes to an active BOM, the changes are saved immediately.
Otherwise, the Save Revision window appears.
Select the Action Required, according to the following descriptions.
The BOM revision number is incremented.
Note: Date of change, version number, type, reference, comment and user are stored in the History tab of the Amend Bill of Materials Record window.
Note: If the BOM is a subassembly, weight is not calculated for higher level BOMs. To ensure that the weight of higher level BOMs is calculated, you must use the Update Bills of Materials Weights option.
Click Yes if you want to calculate costs. The calculated costs are stored on the Costing tab of the BOM record.
The Enter Bills of Material to Cost window appears.
Enter the Cost Quantity for a BOM and click Cost.
The Component Costs window appears if:
The Prompt when stock level is zero setting is selected on the BOM settings Costing tab and the components stock level is zero.
This window indicates that there is no cost, or there is a zero stock level, stored in the stock record for a component on the BOM.
The window clears to allow you to enter the Cost Quantity for another BOM.