Note: The View Operation option allows you to see the entries for the operation records and cost them, but not amend them.
Some of the information that you can enter for an operation can be used in the Bill of Materials module but cannot be used in the Estimating, Planning and Works Orders modules.
Phase |
How many Resource Types? |
Resource Type |
Primary/Secondary |
Fixed Length |
---|---|---|---|---|
Setup |
Two |
Select no more than two resources for this phase. One must be a Machine Resource or a Machine Resource Group. The other can be a Labour Resource or Labour Resource Group. Note: Adding a Labour Resource or Labour Resource Group updates the Include in Labour Requirements check box on the works order operation when a works order is created from the BOM record. |
Select Primary or Secondary for one or the other resource. |
You must select Fixed Length for the resource. |
Runtime |
Three |
Select one Labour Resource or Labour Resource Group. Select one Machine Resource or Machine Resource Group. Select one Tool Resource or Tool Resource Group. Note: Only select a tool resource or resource group if you have also selected a labour and a machine resource or resource group. |
Select Primary for your labour Resource Type and Secondary for your machine Resource Type or vice versa. Note: Do not select either Primary or Secondary for your tool Resource Type selection. |
Do not select Fixed Length for the resource or resource group. |
Teardown |
None |
|
|
Open: Manufacturing System Manager > Operations Register > Records > New Operation.
Open: Manufacturing System Manager > Operations Register > Records > Amend Operation.
When notes are added, an asterisk appears alongside Notes on the tab.
Phase |
How many Resource Types? |
Resource Type |
Primary/Secondary |
Fixed Length |
---|---|---|---|---|
Setup |
Two |
Select no more than two resources for this phase. You can select a labour setup resource (Labour Resource or Labour Resource Group) and a machine setup resource (Machine Resource or Machine Resource Group), but you cannot select two labour or two machine setup resources. Note: Adding a Labour Resource or Labour Resource Group updates the Include in Labour Requirements check box on the works order operation when a works order is created from the BOM record. |
Select Primary or Secondary for one or the other resource. |
You must select Fixed Length for the resource. |
Runtime |
Three |
Select one Labour Resource or Labour Resource Group. Select one Machine Resource or Machine Resource Group. Select one Tool Resource or Tool Resource Group. |
Select Primary for your labour Resource Type and Secondary for your machine Resource Type or vice versa. Note: Do not select either Primary or Secondary for your tool Resource Type selection. |
Do not select Fixed Length for the resource or resource group. |
Teardown |
None |
|
|
To amend a resource, select the resource and change the details.
Step No. |
When adding a resource, a default is displayed, based on the defaults set in Operations Settings and the current number of resources added in the list. You can change the value, if required. The step number is the resource position in the sequence of operation resources. |
Phase |
Select the operation phase when the resource is used. This can be Setup, Runtime or Teardown. |
Resource Type |
Select the resource type: Labour Resource, Labour Resource Group, Machine Resource, Machine Resource Group, Tool Resource or Tool Resource Group. |
Reference |
Select the resource type reference. Note: The Description appears automatically. |
Primary |
Select this option, if the resource is the primary resource in Graphical Planner. Note: If you are using, or plan to use, all Manufacturing modules, then selecting Primary ensures that resource costs are included when an operation with multiple resources is added to an estimate or works order. |
Secondary |
Select this option, if the resource is the secondary resource. Note: The secondary resource will not work with Sage Graphical Planner, but will work with upgraded versions of Preactor Graphical Planner. See your Business Partner if you need more details. |
Rate |
Enter the rate per hour for labour and machine resources and per quantity for tool resources. Note: This is only available if the Allow Cost Rate Override option was selected on the resource. |
Quantity |
Enter the Quantity for costing. This is available if the resource is a tool or tool resource group. Alternatively, it must be a labour resource that has the Piece Work option selected. |
Time |
Enter the time in Hrs, Min and Sec for costing. Note: Important! If you are using or plan to use all Manufacturing modules, do not enter Sec. If you do not know the time, click to display the Enter Time window.
The Absolute Time is calculated automatically. The Hourly Cost Rate is displayed in the Time boxes. |
Fixed Length |
Select if the operation has a fixed length of time when it must be completed. Note: Important! If you are using or plan to use all Manufacturing modules, only select Fixed Length for the Setup Phase resource. |
Fixed Quantity |
Enter the quantity that can be made during the Fixed Length duration, if required. Normally, the time required for an operation resource is the time it takes to make one item, multiplied by the number of items being made. If you select Fixed Length, the amount of time is always what is entered against the resource. Entering a Fixed Quantity allows you to adjust the calculation. For example, if the quantity being manufactured is 100, the quantity per run is 10 and the time is 1 hour:
|
Manning Level |
Enter the number of people assigned to the operation. This is available if the resource is a labour resource group, or a labour resource that does not have Piece Work selected. Note: You must select Use manning level in the BOM Settings Costing tab in order for the manning level to be used during operation costing. |
Notes |
Enter any notes about the resources. |
Note: Resources are sorted by Phase. Phases are sorted into Setup phase, followed by Runtime phase, followed by Teardown phase. In each phase resources are sorted by Step No. or by Reference, as specified in the operations settings.
Add, amend, delete and select the preferred supplier details.
Note: Important! If you are using or plan to use all Manufacturing modules, enter only one subcontract supplier for the operation. The supplier must use base currencyThe operating currency used by your company and the Nominal Ledger; other currencies are regarded as foreign..
A/C |
Select the supplier account. The Name appears automatically. |
Order Ref. |
Enter an order reference number. |
Lead Time |
Enter a Lead Time. Suggested order dates are based on the job start dates. |
Order Details |
Enter additional details for the order to use on subsequent purchase orders raised by Manufacturing, e.g. an S3 item. Note: Click Edit Order Details to display the Edit Order Details window and enter the text required. |
Saturday |
Select this option if the supplier includes Saturdays in their planning operations. |
Sunday |
Select this option if the supplier includes Sundays in their planning operations. |
Cost Heading |
Select the cost heading for the subcontract costs. Note: This can only be an operations cost heading type (Labour, Machine, Tooling or Subcontract). |
Currency |
The supplier currency is displayed. Note: Important! If you are using or plan to use all Manufacturing modules, you must select a subcontract supplier that uses base currency. |
Note: If only one supplier is listed, that supplier is set as the preferred supplier by default.
Add, amend or delete Quantity Breaks.
Note: Important! If you are using or plan to use all Manufacturing modules, do not enter more than five quantity breaks for the operation.
Any existing quantity breaks for the supplier are listed.
Note: Click Add to add a quantity break manually.
From |
Enter the start quantity. |
To |
Enter the end quantity. |
Cost |
Enter the cost. Note: The cost is in the supplier's currency. |
Rate Per Item |
Select this option if the cost is for each item. Leave clear if the cost is for any quantity in the band. |
Hours Offsite |
Enter the number of hours spent offsite. This is used when calculating schedules. |
Do not use automatic generation if you are including decimal values in the quantity breaks. There is a limitation on using decimals with the automatic generator due to conflicts that arise from precision.
If you are using decimal values, it is not possible to determine the precision to use. For example:
1 to 1.99999 2 to 2.99999 |
or |
1 to 2 2.00001 to 3 3.00001 to 4 |
or |
1 to 2 3 to 4 5 to 6 |
There could potentially be gaps, meaning that certain values would not be covered in your quantity breaks.
If you want to generate three quantity breaks automatically, which start from 5.5 and have an interval of 2, the automatically generated values are:
Values between 6.50001 and 7.49999 and 8.50001 and 9.49999 are not covered.
For this reason, we recommend you do not use the automatic generator for decimal values.
To calculate the operation cost, click Cost.
The cost is based on the operation resources. Therefore you must have added resources before you can calculate cost.
The cost can also be based on subcontract information.
Note: By default, the assumption is that one person performs Manufacturing operations. If you want costing to reflect that more than one person performs the operation, ensure that you select Use manning level in the BOM Settings Costing tab.
Costs are calculated using base currencyThe operating currency used by your company and the Nominal Ledger; other currencies are regarded as foreign.. If the suppliers use foreign currency, the values are converted to base currency for costing. However, you define the costs in the supplier's currency.
Click Save.
If you are using all Manufacturing modules, have selected Perform Compatibility Checks in System Settings and have compatibility issues, the Compatibility Warnings prompt appears.
What do you want to do?
Other tasks
Reference