> Manufacturing / Graphical Planner / Scheduling in Graphical Planner / Perform basic tasks / Place operations

Place operations

You can place one or more operations onto the sequencer, either automatically or manually. The automatic method allows you to place all (or a group of), unscheduled operations onto the sequencer at one time. The manual method allows you to assess, operation by operation, what should be placed on the sequencer and where.

You can also use Locate to select a range of operations, on the basis of a number of selection criteria, and automatically place them on the Overview window.

There are different methods of sequencing operations while they are being placed on the Overview window. By default, the sequencer sets the Generate Schedule icon to sequence forward. When doing any type of sequencing, you must select one of the following order processing methods:

To place operations

Select what you want to do:


Go to top