> Bill of Materials / Allocating and building BOMs / Allocation / Confirming build

Confirming build

Note: If you have not reserved specific stock components by allocating stock, use the Build routine to allocate and build immediately.

To build from allocation

Open: Bill of Materials > Processing > Confirm Build.

  1. Select the Allocation No from the drop-down list.
  2. The Allocation Reference and Date are displayed automatically.

    The Build Details area of the window lists the BOMs that have been allocated and are waiting to be built.

  3. To view a list of the components in the allocation and the settings used when the allocation was created, click View Allocation.
  4. Enter the Build Details.
  5. If Print Build Report was selected, the Build Report appears.

Go to top