Within Manufacturing, you can:
Note: You cannot update operationsThe labour, machine and tool processes required to manufacture an item. if you are using version control.
Use this option to update BOMA stock assembly and process costing system, which provides facilities to specify the structure of finished items in terms of sub-assemblies and components. operation details automatically, with operation details from the Operations Register.
Note: Whilst this option is in use, you and other Sage 200 users cannot use any other option in Bill of Materials, Labour Register, Machine Register, Tool Register and Operations Register.
If version control is in use, a new BOM will be created.
Note: If you have selected Allow Active BOMs to be amended in the BOM Settings General tab, and details are being updated in active BOMs, a new BOM is not created. The details in the active BOM will be updated.
Open: Manufacturing System Manager > Operations Register > Utilities > Maintenance > Update Operation Details.
Note: You can also access Update Operation Details from the Bill of Materials > Utilities > Maintenance menu.
You can update overlap/shrinkage details, runtime defaults, delay details, notes, resources and subcontract details.
Note: You cannot update operationsThe labour, machine and tool processes required to manufacture an item. if you are using version control.
You can update cost rates on resources, operations and BOMA stock assembly and process costing system, which provides facilities to specify the structure of finished items in terms of sub-assemblies and components. operations, based on the current cost rates defined on resource groups, resources or operation records. If you choose to update BOM operations, you are prompted to select the relevant BOM records to update.
You can choose the source and target record types for the update. Target record cost rates are only updated when there is a direct association with the source record type.
For example, if you are updating operations or BOM operations from a resource group, updates are only made on operations and BOM operations, if the operation Resource Type is the same resource group.
This can be illustrated as follows.
Source |
Selection |
Target |
What is updated |
---|---|---|---|
Select Resource Group as the Source Record Type. |
Select Labour Register as the Record Type. |
Select Resources as the Target Record Type. |
All labour resources in the labour resource group are updated with the cost rates in the labour resource group. |
Select Resource Group as the Source Record Type. |
Select Labour Register as the Record Type. |
Select Operations Register as the Target Record Type. |
Operations are only updated if the operation Resource Type is Labour Resource Group. Note: Although labour resources have been updated with the rates from the resource group, any labour resources on the operation are not updated at this stage. |
Select Resource Group as the Source Record Type. |
Select Labour Register as the Record Type. |
Select Bill of Materials Operations as the Target Record Type. |
BOM operations are only updated if the BOM operation Resource Type is Labour Resource Group. Note: Although labour resources have been updated with the rates from the resource group, any labour resources on the operation are not updated at this stage. |
If you want to update resources on the operations and BOM operations, you must update the operation values directly from the resource values, as follows:
Source |
Selection |
Target |
What is updated |
---|---|---|---|
Select Resource as the Source Record Type. |
Select Labour Register as the Record Type. |
Select Operations Register as the Target Record Type. | All operations in the operations register where the operation Resource Type is Labour Resource. |
Select Resource as the Source Record Type. |
Select Labour Register as the Record Type. |
Select Bill of Materials Operations as the Target Record Type. | All BOM operations where the BOM operation Resource Type is Labour Resource. |
Whilst this option is in use, you and other Sage 200 users cannot use any other option in Bill of Materials, Labour Register, Machine Register, Tool Register and Operations Register.
Note: If you are updating BOM operations, we recommend that you recost your BOMs.
If you are updating BOM operations, and version control is in use, a new BOM will be created.
Note: If you have selected Allow Active BOMs to be amended in the BOM Settings General tab, and rates are being updated in active BOMs, a new BOM is not created. The rates in the active BOM will be updated.
Open: Manufacturing System Manager > Operations Register > Utilities > Maintenance > Update Operation Rates.
Note: You can also access Update Operation Rates from the Bill of Materials > Utilities > Maintenance menu.
Select the Source Record Type.
This can be Resource Group, Resource or Operations Register.
Select one of the record types from the list.
Source Record Type | Source record types displayed |
---|---|
Resource Group |
Labour Resource Groups Machine Resource Groups Tool Resource Groups Note: If you are updating from tool resource groups, the quantity is also updated from the tool resource group. |
Resource |
Labour Resources Machine Resources Tool Resources |
Operations Register |
Operations |
Select one of the Target Records from the list.
Source Record Type | Target record types displayed |
---|---|
Resource Group |
Resources Operations Register Bill of Materials Operations |
Resource |
Operations Register Bill of Materials Operations |
Operations Register |
Bill of Materials Operations Note: If Operations Register is your source record type, you do not need to select a target record type as the target can only be the Bill of Materials Operations. |
Select Update manually amended rates (Operations Register and Bill of Materials Operations only). if you want to overwrite any rates that have been amended manually.
Note: You can only select this if Operations Register or Bill of Materials Operations are selected as a target record type.
If you selected to update Bill of Material Operations, the Enter Bills of Materials window appears.
Note: We recommend that you recost your BOMs.
You can change the hourly rates attached to all of your labour categories or to a specific labour categoryUsed to group employees according to their function or skill within the production process. For example, apprentices, fitters or supervisors. This grouping can be used when entering timesheet information or in the Operation Times module..
The changes do not apply to existing estimatesForecast project costs, based on expected costs of labour, machinery and operation times. In Manufacturing, estimates are produced for one-off items or non-repetitive batches..
Open: Estimating > Utilities > Maintenance > Update Employees.
Use this option to can change hourly rates in all labour categories at once. The changes do not apply to existing estimatesForecast project costs, based on expected costs of labour, machinery and operation times. In Manufacturing, estimates are produced for one-off items or non-repetitive batches..
If you only want to change rates for certain employee categories, use Update Employees instead.
Open: Estimating > Utilities > Maintenance > Update Labour Categories.
You can update machine resource details with the details currently held on the resource group. Whilst this option is in use, no other option in the Machine Register can be used.
Note: Following this, you may also want to update operations with resource changes. You can do this by updating operation details and operation rates.
Open: Manufacturing System Manager > Machine Register > Utilities > Maintenance > Update Machine Resource Details.
You can update tool resource details with the details currently held on the resource group. Whilst this option is in use, no other option in the Tool Register can be used.
Note: Following this, you may also want to update operations with resource changes. You can do this by updating operation details and operation rates.
Open: Manufacturing System Manager > Tool Register > Utilities > Maintenance > Update Tool Resource Details.
You can update labour resource details with the details currently held on the resource group. Whilst this option is in use, no other option in the Labour Register can be used.
Note: Following this, you may also want to update operations with resource changes. You can do this by updating operation details and operation rates.
Open: Manufacturing System Manager > Labour Register > Utilities > Maintenance > Update Labour Resource Details.
You can replace components in many works orders at the same time, using the Replace Component option.
Open: Works Orders > Utilities > Maintenance > Replace Component.
The Description appears automatically.
The Description appears automatically.
Note: The replacement item must support the same unit of measure as the original item. Even if it does, it may not be a suitable alternative item. In this case, you must confirm the replacement when you click OK.
Manufacturing finds all works orders which contain the part to be replaced and substitutes the new item.
Note: Use the Bill of Materials Replace Components option to replace components in BOMs.
Reference