You can edit the number of resources assigned to a task and change how the information will be displayed on the sequencer.
The operation details in Operations Register link to the Graphical Planner secondary constraints. The Reference field and Description field in the Secondary Constraints window, is reflected in Manufacturing.
Open: Manufacturing System Manager > Operations Register > Records > New Operation or Amend Operation.
Open: Maintain Database > Secondary Constraints.
Double-click the desired secondary constraint.
The Edit Secondary Constraints Information window appears.
Note: You must not change the Name or Description because Graphical Planner will not allocate work correctly. You must edit the name and description in Manufacturing.
Allows you to select the colour of the Sequencer User Plot when the values are between the high and low limits.
Sets the plotWithin Graphical Planner, this indicates the amount of work waiting to be processed at a selected resource across the period of the schedule. It can also display the utilisation of a resource, as well as the queue. fill pattern.
For example, a pattern can be a solid colour, lines, dots, cross hatches, waves, or blank.
The plot fill colour if the plot should pass the upper plot limit.
The plot fill colour if the plot should pass the lower plot limit.
Determines how the primary resourceSince Graphical Planner is a single constraint scheduler, the resource you select is the Primary Resource. You can determine whether machine or labour is your primary resource by specifying the type in Manufacturing's Planning Defaults window. calendar efficiency affects the usage of this secondary constraint (secondary resourceA secondary resource is an additional resource used to perform a task. For example, machines may be the primary resources and the labour or people needed to operate them are defined as secondary resources.).
Select if you want the scheduler to issue warnings if limits set for the secondary resource, are exceeded.
Select this to display a usage plotWithin Graphical Planner, this indicates the amount of work waiting to be processed at a selected resource across the period of the schedule. It can also display the utilisation of a resource, as well as the queue. for the secondary resource located in the sequencer Plots window.