> Manufacturing / Graphical Planner / Setting up Graphical Planner / Resources / Secondary resource

Secondary resources

You can edit the number of resources assigned to a task and change how the information will be displayed on the sequencer.

Note:

The operation details in Operations Register link to the Graphical Planner secondary constraints. The Reference field and Description field in the Secondary Constraints window, is reflected in Manufacturing.

Open: Manufacturing System Manager > Operations Register > Records > New Operation or Amend Operation.

To edit a secondary resource

Open: Maintain Database > Secondary Constraints.

  1. Double-click the desired secondary constraint.

    The Edit Secondary Constraints Information window appears.

    Note: You must not change the Name or Description because Graphical Planner will not allocate work correctly. You must edit the name and description in Manufacturing.

  2. Select the following options:
  3. Click OK.
  4. Click Save.