> Set up Sage 200 / Bill of Materials / Allocation

Allocation (BOM settings)

There are a number of shared settings between Trial Kitting, Allocation and Build. These can be entered on the Trial Kitting tab, the Allocation tab or the Build tab.

To use the Allocation tab

Open: Bill of Materials > Utilities > System Set Up > Bill of Materials Settings | Allocation.

Enter the following Allocation and Build Shared Settings:

Enter the Trial Kitting, Allocation and Build Shared Settings:


Go to top