Set up project level defaults

Use the Defaults tab to set the default status for the project level.

To enter defaults

Open: Project Accounting > Utilities > System Setup > Project Structure Settings | Project Levels.

  1. Click Add or select a project level and click Edit.
  2. Select the Default tab.