Note: The information entered in the estimate operation is different from that in the Operations Register.
Open: Estimating > Records > Enter New Estimate - Full | Stages.
Note: As you enter operation details, the total costs by category appear on the Operations tab in Stage Details.
Reference |
If you did not enter this on the operation header, enter a unique operation Reference. |
Description |
If you did not enter this on the operation header, enter an operation Description. This appears on works order documentation. |
Notes |
Enter additional information relating to the operation. You can add notes to works order documentation by amending the report layout. Customising works order documentation works in the same way as for other manufacturing reports. |
Do not print this operation |
Select this check box if you do not want to print the operation on documentation, such as route cards. |
Qty Per Run |
Enter a Qty Per Run/Run Time Defaults amount in the relevant boxes. For example, if the cycle time for 1000 finished items is five hours, enter: Qty Per Run 1000 Run Time 5 Hrs 0 Mins. This would be exactly the same as entering: Qty Per Run 2000 Run Time 10 Hrs 0 Mins. Note: Any related combinations can be used. |
No. of pieces per finished item |
The value entered here is taken by default from the No. of pieces value on the Estimate stage details. It indicates the number of individual items required for each finished item. |
Update Resource Details |
To enter Hour and Minutes values into the Time Needed boxes on the Resource Details tab, click Update Resource Details. |
Setup |
Enter the machine setup time needed as well as the appropriate rate. The application multiplies these amounts to calculate the cost. To add setup time to the labour time required, select the Include in labour requirement check box. |
Delay/Overlap/Shrinkage |
To control the gap between completing this operation and starting the next, choose one of the following options:
|
Subcontract |
If the operation is subcontracted to an external organisation or department, select the Subcontract check box and click Details.
A/C
Enter the account number of the preferred subcontractor for the operation. Lead Time
Enter a Lead Time. Suggested order dates are based on job start dates. Order Narrative
Enter an Order Narrative and any additional information to use on subsequent purchase orders. Details
Enter text to be placed as an S3 item on any Purchase Orders raised by Manufacturing when allocating stock in Works Orders. |
Tooling |
Enter the tooling Cost, plus the related Quantity of finished items you can produce for the cost. |
Piece Work |
If a cost is based on number of items completed, rather than an hourly rate, select the Piece Work check box. Enter a cost in the Rate box and number of items completed for that rate in the Per Quantity box. For example, Rate = £20; Per Quantity = 10. |
The machine must be defined in the Machine Register.
The labour process must be defined in the Labour Register.
Depending on the Use manning level setting in the BOM settings Costing tab, you can calculate labour costs based upon the value entered here. If one hour is needed, at a rate of £7.50, but the job requires two people, the calculated cost is 1 x £7.50 x 2 = £15.00.
When you create a works orderThe authority to produce a part using the components specified on a BOM and the process specified on the routing. from the estimate, the componentsRaw materials used to manufacture finished goods. are copied to the works order for printing on subcontract operationsWork tasks that are subcontracted to external organisations or to other internal departments within the organisation. advice notesA note to a purchaser advising on the intended purchase..
Note: If the quantity does not match the unit of measureThe quantity in which a stock item is measured for purchase, sale or storage., the quantity is automatically adjusted to the nearest appropriate value.